Customization: | Available |
---|---|
After-sales Service: | Drawing Design/Application Training |
Certification: | ASTM, CE, ISO, MSDS |
Still deciding? Get samples of US$ 0/A4 Paper
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PENNFLEX PH2000 is a kind homogeneous, non-reinforcement, two-colors, UV-Limited, flexible plastic sheet base on premium polyvinyl chloride (PVC) resin, with a signal layer on upper surface, specially designed for underground tunnel and basement waterproofing projects.
PENNFLEX PL: Homogeneous PVC membrane with fleece-backed, commonly used for fully bonding roof waterproofing.
PENNFLEX PH: Homogeneous PVC membrane with twin color, commonly used for foundation and tunnel waterproofing.
PENNFLEX PP: PVC membrane reinforced with polyester, commonly used for all kinds of exposed roof waterproofing.
Type | Thickness | Width | Length |
PENNFLEX PL/PH/PP 1200 | 1.2mm | 2m | 20m |
PENNFLEX PL/PH/PP 1500 | 1.5mm | 2m | 20m |
PENNFLEX PL/PH/PP 2000 | 2.0mm | 2m | 20m |
1. Excellent anti-aging;
2. High vapor permeability;
3. High resistance to puncture;
4. High workability and weldability;
5. Excellent Root resistant penetration;
6. Excellent resistant to swelling, rotting.
1. Tunnels and buried galleries;
2. Cut and cover tunnels;
3. Underground works;
4. Coverings of buried structures;
5. Underground car parks etc...
1. Q: Are you trading company or manufacturer?
A: We are manufacturer.
2. Q: How long is your delivery time?
A: Generally it is 5-7 work days after deposit and depends on your quantity.
3. Q: Do you provide samples?
A: Yes, free sample is available. Before cooperation, delivery cost needs to be paid by customer, but it can be deducted in future orders.
4. Can You Make Our Design Or Put Our Logo On The Product?
A: Yes,We support OEM & ODM, your art work labels can be sticked on cargo packages.
5. Q:How do you ensure the quality?
A:We are working with there QC processes to guarantee the quality:
1) For raw materials;
2) Onsite inspection during production;
3) Final QC test for each batch of finished products.