Customization: | Available |
---|---|
After-sales Service: | Drawing Design/Application Training |
Certification: | ASTM, CE, ISO, MSDS |
Still deciding? Get samples of US$ 0/A4*4 Pieces
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
0.5mm, 1.0mm, 1.2mm, 1.5mm Waterproofing EPDM Membrane For Fish Pond
RUBBPLUS is a kind of elastic, eco-friendly, reinforced with fleece back or non-reinforced, weldable synthetic rubber waterproof sheet based on premium quality EPDM (Ethylene-Propylene-DieneTerpolymer), ballasted or fully adhered application method should be approved.
RUBBPLUS VRH: Homogeneous EPDM membrane, commonly used for all kinds of exposed roof or pond project.
RUBBPLUS VRL: Homogeneous EPDM membrane with fleece backed, commonly used for all kinds of exposed roof project.
RUBBPLUS VRS: Homogeneous EPDM membrane coated with glue, commonly used for fully bonding roofs or foundation project.
Type | Thickness | Width | Length |
RUBBPLUS VRL/VRH/VRS1200 | 1.2mm | 1-3m | 20m |
RUBBPLUS VRL/VRH/VRS1500 | 1.5mm | 1-3m | 20m |
RUBBPLUS VRL/VRH/VRS 2000 | 2.0mm | 1-3m | 20m |
1. Excellent resistance to alkali rains;
2. Excellent low-temperature bending;
3. Excellent UV-resistance and anti-aging;
4. Excellent tensile strength and elongation performance;
5. Especially suit for projects with high requirements in durability, anti-corrosion and deformation;
1. Q: Are you trading company or manufacturer?
A: We are manufacturer.
2. Q: How long is your delivery time?
A: Generally it is 5-7 work days after deposit and depends on your quantity.
3. Q: Do you provide samples?
A: Yes, free sample is available. Before cooperation, delivery cost needs to be paid by customer, but it can be deducted in future orders.
4. Can You Make Our Design Or Put Our Logo On The Product?
A: Yes,We support OEM & ODM, your art work labels can be sticked on cargo packages.
5. Q:How do you ensure the quality?
A:We are working with there QC processes to guarantee the quality:
1) For raw materials;
2) Onsite inspection during production;
3) Final QC test for each batch of finished products.